中国华能集团有限公司
China Huaneng Group Co., Ltd.

主营产品:电源开发、投资、建设、经营和管理,电力(热力)生产和销售,金融、煤炭、交通运输、新能源、环保相关产业及产品的开发、投资、建设、生产、销售,实业投资经营及管理

公司介绍

中国华能集团有限公司(以下简称中国华能)创立于1985年,是集电力、煤炭、金融、科技、交通运输产业于一身的综合能源集团, 2009年在中国发电企业中率先进入世界企业500强,2024年排名第238位。

China Huaneng Group Co. Ltd. (China Huaneng), established in 1985, is an integrated energy company with businesses covering sectors of power generation, coal, finance, S&T, and transportation. As the first Chinese power generation company joining the Global Fortune 500, China Huaneng is ranked 238th in 2024.  


中国华能成立40年来,大力弘扬改革创新精神,全力打造“世界一流现代化清洁能源企业”。中国华能资产总额超1.7万亿元,发电装机容量超2.79亿千瓦,低碳清洁能源装机占比超53%,其中火电1.46亿千瓦,太阳能5635万千瓦, 风电4773万千瓦,水电2956万千瓦,煤炭生产能力超1亿吨/年,海外电力资产分布在6个国家,有7个海外代表处,员工总数约12.3万人。

Over the past 40 years since its establishment, China Huaneng has vigorously promoted the spirit of reform and innovation, and is committed to building a world-class modern clean energy enterprise. China Huaneng's total assets exceed 1.7 trillion yuan. The total installed power capacity of China Huaneng surpassed 279 GW with the proportion of low-carbon and clean energy installed capacity exceeding 53%. Among them, the thermal power installed capacity reached 146 GW, solar power 56.35 GW, wind power 47.73 GW, and hydro power 29.56GW. Its coal annual output capacity surpassed 100 million tons. Huaneng’s overseas power assets are distributed in 6 countries, with 7 overseas representative offices. The total number of employees is about 123,000. 


中国华能自2004年涉足核电领域以来,先后在山东、福建、海南、辽宁等省份开展核电厂址开发工作,形成了山东石岛湾、海南昌江、福建霞浦三大沿海核电基地,并储备了多个厂址。目前在运一座高温气冷堆核电站,在建山东石岛湾扩建工程一期和海南昌江核电项目二期共4台压水堆核电机组,装机500万千瓦。福建霞浦规划建设1台60万千瓦高温气冷堆机组和4台百万千瓦级压水堆机组,前期工作有序开展。此外,还有多个核电厂址处于储备开发阶段。

Since China Huaneng set foot in the field of nuclear power in 2004, it has successively carried out nuclear power plant site development work in Shandong, Fujian, Hainan, Liaoning and other provinces, forming three major coastal nuclear power bases: Shidao Bay in Shandong, Changjiang in Hainan, and Xiapu in Fujian, and has reserved multiple plant sites. At present, a high-temperature gas-cooled reactor nuclear power plant is in operation, and there are four pressurized water reactor nuclear power units under construction in phase I of Shandong Shidao Bay Expansion Project and phase II of Hainan Changjiang Nuclear Power Project, with an installed capacity of 5 million kilowatts. Xiapu Nuclear Power Plant plans to build a 600,000-kilowatt high-temperature gas-cooled reactor unit and four million-level pressurized water reactor units, and the preliminary work is being carried out in an orderly manner. In addition, there are several nuclear power plant sites still in the reserve development stage.

产品展示
联系我们

地址:北京市西城区南礼士路21号六层

电话:010 - 56971705 ; 010 - 56971702    传真:010-56971700

邮箱:cnea@org-cnea.cn   京ICP备16008721号-2

京公网安备 11010802033858号

您是访问本站的第位嘉宾

技术支持:中科服

第十六届中国国际核电工业展览会

微博、微信

你知道你的Internet Explorer是过时了吗?

为了得到我们网站最好的体验效果,我们建议您升级到最新版本的Internet Explorer或选择另一个web浏览器.一个列表最流行的web浏览器在下面可以找到.